The clearest revision request names the slide number and its title, quotes the exact wording to change, and lists anything that must stay frozen. Ask Buda to leave every other slide as it is.

How to request a change to one slide
After the first draft is in front of you:
- Identify the slide by number and title (for example, “Slide 4, ‘Q3 results’”).
- Quote the exact text, figure, or label you want changed, and write the replacement.
- State clearly: change only this slide; do not restyle or rewrite the others.
- If several slides need edits, list them the same way in one message, still saying that unlisted slides stay unchanged.
You can paste a prompt like this:
On slide 4, titled “Q3 results”, replace the sentence “Revenue grew quickly” with “Revenue grew 12% year over year.” Do not change any other slides, and do not alter the figures or product names listed below.
Confirming the outline first usually means fewer slide-by-slide fixes later: 用 Buda 根据多份资料做演示稿,怎样先确认大纲再生成?
How to keep figures and product names unchanged
In the same message (and in the original task, if you already know them), add a short do-not-change list, for example:
- Product names: …
- Figures that must stay exactly as written: …
Ask Buda to copy these strings verbatim and not to “clean up” punctuation, capitalization, or units.
How to verify
- Open the revised deck and check the named slide against your wording.
- Spot-check neighboring slides and the frozen names or figures to confirm they were not rewritten.
Boundaries
- If you only say “make slide 4 better” without quoting the text, nearby slides or locked figures may change too.
- Regenerating the whole deck can still drift, even with a freeze list; for a small fix, prefer a targeted edit of the existing presentation.